| 4. The stairs are planned here |
|
|
|
|
|
| |
|
|
|
| 5. The stairs are planned here |
|
|
|
|
|
| |
|
|
|
| 6. Installation of structure element for Roman step |
|
|
|
|
|
| |
|
|
|
| 7. Preparation of the place for filtration panel VSV |
|
|
|
|
|
| |
|
|
|
| 8. Filtration unit VSV is installed |
|
|
|
|
|
| |
|
|
|
| 10. Water filling of the pool |
|
|
|
|
|
| |
|
|
|
| 11. Swimming pool after renovation |
|
|
|
|
|
| |
|
|
|
| 1. Assembling and steel reinforcing of formwork VSV |
|
|
|
|
|
| |
|
|
|
| 2. Before pouring with concrete |
|
|
|
|
|
| |
|
|
|
| |
|
|